This week, we continued to develop our project to prepare it for the mid-point review. The Interior Designers focused on developing the 8,000 sq. ft. that will be shown in the final presentation. The Architects focused on exterior perspectives and elevations.

Our goals for the week include:
  • fully developed floor plans for the 4 chosen spaces
  • windows added to the exteriors
  • finalized exterior materials




FLOOR PLANS
greyed-out areas are those not to be developed for the final presentation
floors are in order from 1st to 3rd







Elevations

NORTH



EAST




SOUTH






WEST




Site

Perspectives
Ampitheatre


Entrance
View from SouthEast corner of the site


 Patio/Entrance Area

 Entrance/Patio Area


 Water Feature on East Wall


View from the SouthWest